Energy Audit, Modification in existing electrical distribution network, Power Factory corrections and maintain Harmonic levels. Extension of 800 Kw loads with the existing setup.
A New Administrator Office Building of 300 Kw loads each with 100% Captive Power Load with L.T. Distribution and Internal Wiring design for Admin. Building L.V. System viz. LAN, CCTV, Access Control, P.A. System, etc
Modification in the existing electrical distribution network.
A New press factory development with new printing machines of Manugraph of 380 Kw load each with 100% Captive Power Load with L.T. Distribution and Internal Wiring design for Admin. Building L.V. System viz. LAN, CCTV, Access Control, P.A. System, etc
Modification in existing electrical distribution network, Power Factory corrections and maintain Harmonic levels.
A New Industrial development of 315 KVA load with L.T. distribution and Internal Wiring design, etc., with Modern automation facilities.
Project Design for MEP Services for Hidco, West Bengal
An Industrial Factory shed of 315 KVA load with L.T. distribution and Internal Wiring design, etc.
Project Design for MEP Services Aprox. Construction area-1,90,000Sq.ft.
Project Design for MEP Services for Cotmac Electronics Pvt. Ltd.